Details
2) Filling Part
Our company introduces German technology, designing and manufacturing by ourselves.Uses the principle of equal pressure filling, so as to fill the liquid into the washed bottles sent by the bottle washing machine.
The filling valve adopts constant pressure mechanical valve, which makes the filling process quick and sensitive, with high precision of filling liquid level.
Touching guide adopts lifting cylinder with touching pre cover structure. The unique bottle mouth clamping technology ensures the accurate sealing between the bottle mouth and the filling valve, and reduces the leakage of materials from the bottle mouth.
The main drive adopts gear drive. It is also called open combination drive, with high efficiency, low noise, long service life, convenient maintenance and sufficient lubrication. Adopt frequency converter to control the speed of the main motor of the machine. And the machine adopts stepless frequency conversion to adjust speed.
The structure of the bottle guiding system is simple, and it can be changed quickly and conveniently according to the bottle type. The whole machine adopts the structure of clamping bottle neck for conveying.
The whole machine is controlled automatically by PLC. Faults are displayed online, such as bottle blocking, cover lacking, etc.
The material in the filling cylinder is automatically controlled. The liquid level height is detected by the liquid level sensor to ensure the stability of liquid level and the reliability of filling.
4-20mA analog quantity is used for automatic control of material level and liquid feeding in the filling cylinder.After the liquid level sensor detects the liquid level height, it controls the opening of the liquid inlet membrane valve to ensure the liquid level stability and reliable filling.
The key parts and electrical components of this machine are imported products.
The machine adopts centralized lubrication system, which can easily lubricate all lubrication points.
Item | DXGF18-18-6 | DXGF24-24-8 | DXGF32-32-10 | DXGF40-40-12 | DXGF50-50-15 | DXGF60-60-15 | DXGF72-72-18 | DXGF80-80-20 | |
Rated Output (500ml bottle)Bottles/h | 5000 | 8000 | 12000 | 15000 | 18000 | 24000 | 29000 | 33000 | |
Washing Station | 2.5 | 5 | 6 | 8 | 11 | 15 | 20 | 20 | |
Draining station | 3.5 | 6 | 10 | 12 | 14 | 25 | 27 | 32 | |
Flow of Filling Valve (ml/s) | 135 | 135 | 135 | 135 | 135 | 135 | 135 | 135 | |
Filling Temperature | 0~4ºC | 0~4ºC | 0~4ºC | 0~4ºC | 0~4ºC | 0~4ºC | 0~4ºC | 0~4ºC | |
PET Bottles | Diameter | 60~97mm | 60~97mm | 60~97mm | 60~97mm | 60~97mm | 60~97mm | 60~97mm | 60~97mm |
Height | 50~320mm | 150~320mm | 150~320mm | 150~320mm | 150~320mm | 150~320mm | 150~320mm | 150~320mm | |
Screw Cap Torque (N.m) | 0.6~2.8 | 0.6~2.8 | 0.6~2.8 | 0.6~2.8 | 0.6~2.8 | 0.6~2.8 | 0.6~2.8 | 0.6~2.8 | |
Installed Capacity (Kw) | 2.38 | 4.18 | 4.18 | 4.37 | 5.87 | 5.87 | 9.57 | 9.57 | |
Consumption of Compressed Air (0.6Mpa)m3/min | 1.5 | 1.5~2 | 1.5~2 | 1.5~2 | 2~2.5 | 2~2.5 | 2.5~3 | 2.5~3 | |
Consumption of Water (0.2-0.25Mpa)m3/h | 1.5 | 0.6 | 0.8 | 0.8 | 1 | 1.5 | 1.5 | 2 | |
Overall Dimension (mm) | 2500×2100×2700 | 2800×2400×2700 | 4000×2550×2850 | 4400×2900×2850 | 5350×3500×2850 | 5000×5000×3000 | 7100×6250×3000 | 7700×6750×3000 | |
Total Weight (Ton) | 5.5 | 7 | 8 | 9 | 10.5 | 14 | 16 | 18 |
1. Warranty
All parts are under two year warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
50% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the purchase contract is signed.
50% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$100/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Home Products About Us News Solutions Video Contact Us Privacy Policy